Categories Port & CPEC News

Balochistan Ramps Up Road Construction: 183 Projects Worth Rs7.2 Billion Now Underway

Balochistan is in the middle of one of its busiest stretches of road-building in years. According to Radio Pakistan, 183 road construction and rehabilitation projects are currently underway across 41 of the province’s districts under the Balochistan Special Development Initiative (BSDI), with Rs7.2044 billion allocated to road works for the current financial year — on top of Rs5.089 billion spent on roads in the province last fiscal year. The provincial push comes alongside, and separate from, the federally funded CPEC highway sections that are meant to eventually link Gwadar Port to the rest of Pakistan.

Paved road running through brown, arid mountains under a blue sky, representative image for road construction across Balochistan
A mountain road representative of the terrain crews are working through across Balochistan’s 41 districts. Image: Unsplash / Walter Sepulveda

What the New Figures Show

The BSDI figures, reported on October 31, describe road work as part of a broader effort to improve connectivity between towns and districts and make travel easier across a province where many areas remain cut off by distance and terrain. The report did not name individual projects or give a province-wide completion date, but the scale — 183 separate schemes running at once — signals a sustained push rather than a one-off announcement.

A companion report from Radio Pakistan on October 28 offered an early look at what BSDI delivery looks like on the ground. In Panjgur district, 76 development projects under BSDI Phases One and Two have been completed at a cost of more than Rs830 million, finishing ahead of schedule. The projects there spanned new classrooms, digital libraries, healthcare facilities, clean drinking water schemes and roads. BSDI Phase Three in Panjgur was launched on September 14 with a fresh allocation of Rs605 million, suggesting the initiative is being rolled out in successive phases district by district rather than as a single province-wide contract.

Road construction crew with machinery repairing a road surface, representative image for crews working on Balochistan's 183 road projects
Repair and paving crews are the common thread across BSDI’s hundreds of smaller road schemes. Image: Unsplash / Ray Donnelly

The Bigger Highways Are a Separate, Slower Story

The BSDI road drive runs alongside — and should not be confused with — the much larger, federally funded CPEC Western Route highway network, which this outlet reported on earlier this month. As of early October, four CPEC-linked sections covering 718 kilometres (Hoshab-Awaran, Awaran-Naal, Basima-Khuzdar and Zhob-Kuchlak) had received Rs54.9 billion of the Rs83.2 billion allocated to them, leaving a funding gap of roughly Rs28.3 billion.

Those highways sit inside a wider, multi-year programme. Federal Planning Minister Ahsan Iqbal has previously directed that roughly Rs400 billion worth of Balochistan road projects — including the dualisation of the Khuzdar-Kuchlak and Karachi-Quetta-Chaman sections, the Hoshab-Awaran-Khuzdar package, the Gwadar-Ratodero road under the M-8, and the Yarik-Sagu-Zhob bypass — be completed within three years. Separate project documentation has set staggered target dates for individual sections running from mid-2026 through October 2027 and, for the Zhob-Kuchlak dualisation, as late as June 2028. Two of the nearer-term targets, for the Quetta Western Bypass and the Nokundi-Mashkel road, were set for June 2026; neither project’s completion has been publicly confirmed since that date passed, a reminder that published target dates on Balochistan’s highway network have not always held.

A highway zigzagging up a mountainside, representative image for the CPEC western route highway sections under construction in Balochistan
CPEC’s western route highways climb through some of Balochistan’s most difficult terrain. Image: Unsplash / Blair Fraser

Why Gwadar Has a Stake in Every Mile

None of this road-building is happening in isolation from Gwadar. The port city sits at the end of the M-8 corridor, and the Gwadar-Ratodero road is explicitly part of the federal government’s Rs400 billion Balochistan highway package. Gwadar Port’s own ambitions — from its 10-year Smart Port City master plan to a prospective sister-port arrangement with Oman’s Sohar Port — depend on cargo being able to move cheaply and reliably between the port and markets inland. A free zone, a terminal, or a desalination plant can be finished on schedule at the port itself, but that investment delivers less value if trucks still face broken or half-built roads for hundreds of kilometres between Gwadar and Quetta, Karachi or the Afghan and Iranian borders.

A cargo truck travelling on a highway, representative image for freight and trade traffic that depends on Balochistan's road network reaching Gwadar Port
Freight bound for or from Gwadar Port depends on the same provincial road network the BSDI figures describe. Image: Unsplash / Gabriel Santos

A Province Watching Its Own Deadlines

Balochistan’s recent history with large infrastructure timelines counsels some caution about taking any new schedule at face value. This outlet has previously reported on how Gwadar’s Safe City project ran nine years behind its original schedule and over budget before it was finished. The BSDI figures released this week describe funding committed and projects “underway,” not projects completed — the real test, as Panjgur’s 76 finished schemes suggest, will be how many of the 183 current projects are actually delivered, and on what timeline, across the rest of the province’s districts.

Quick Facts

  • Projects underway: 183 road projects across 41 districts of Balochistan (BSDI)
  • This year’s allocation: Rs7.2044 billion
  • Last year’s spending: Rs5.089 billion
  • Panjgur, Phases One & Two: 76 projects completed, over Rs830 million, finished ahead of schedule
  • Panjgur Phase Three: launched September 14, Rs605 million allocated
  • CPEC Western Route (4 sections, 718km): Rs54.9bn released of Rs83.2bn allocated, as of early October
  • Federal highway package tied to Balochistan: roughly Rs400 billion, including the Gwadar-Ratodero road

Sources: Radio Pakistan (October 31, 2026; October 28, 2026), the Associated Press of Pakistan, INP-WealthPK, and The Diplomatic Insight.

Leave a Reply

Your email address will not be published. Required fields are marked *